this post was submitted on 01 Nov 2024
16 points (100.0% liked)

UK Rail and Trains

233 readers
16 users here now

Talk about the UK rail network.

founded 1 year ago
MODERATORS
Mex
top 3 comments
sorted by: hot top controversial new old
[–] blackn1ght 4 points 2 weeks ago (1 children)

I thought they were already in the process of building the infrastructure at Euston for HS2?

[–] AngusTheNerd 2 points 2 weeks ago

Previous government intended to cancel the leg to Euston despite all the work already being done to save money, but hadn't confirmed.

It made little sense because they'd already spent a lot of money to build a good amount of it and would've made all of it a waste.

Not to mention, having a high speed line terminate further than the main line it's meant to take pressure from would've defeated made the line effectively useless.

[–] Zip2 3 points 2 weeks ago

That photo. The internet has ruined me.