this post was submitted on 09 Nov 2023
321 points (95.7% liked)

Humor

7444 readers
441 users here now

"Laugh-a-Palooza: Unleash Your Inner Chuckle!"

Rules


Read Full Rules Here!


Rule 1: Keep it light-hearted. This community is dedicated to humor and laughter, so let’s keep the tone light and positive.


Rule 2: Respectful Engagement. Keep it civil!


Rule 3: No spamming!


Rule 4: No explicit or NSFW content.


Rule 5: Stay on topic. Keep your posts relevant to humor-related topics.


Rule 6: Moderators Discretion. The moderators retain the right to remove any content, ban users/bots if deemed necessary.


Please report any violation of rules!


Warning: Strict compliance with all the rules is imperative. Failure to read and adhere to them will not be tolerated. Violations may result in immediate removal of your content and a permanent ban from the community.


We retain the discretion to modify the rules as we deem necessary.


founded 1 year ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] Kiosade@lemmy.ca 11 points 1 year ago (5 children)

But like… how did they even do the first step of ramming the wood piles into a deep ass river without big machinery of some kind?

[–] MeanEYE@lemmy.world 12 points 1 year ago

Long time and unlimited resources is usually the way to go. Sure machinery would make it fast, but you can get 10 guys to hammer for 2 years to drive it. Then move on. Even today it's a huge logistics and financial problem to build bridges which is why typically it's always governments that did it.

[–] Glemek@lemmy.world 10 points 1 year ago (2 children)

The machine that shows up about 3 seconds in looks to me like a manual piledriver, uses pulleys and cranks yo pull the weight up, then just gravity to drop it down the track.

[–] Madison420@lemmy.world 6 points 1 year ago* (last edited 1 year ago)

It is. Time team did a bit on it. I'll try to find it.

Ed: https://youtu.be/8FAF1eW9Lz0

That episode, I'll watch and find a time stamp but it'll be a second.

47:40

[–] Kiosade@lemmy.ca 3 points 1 year ago

Kinda does, yeah, but it’s only put into place after all the piles are in! Maybe they have one of those anchored on a boat or something?

[–] HonoraryMancunian@lemmy.world 7 points 1 year ago (2 children)

Sledgehammers (or similar) and lots and lots of manpower I'd guess. It's how they made it watertight before they drained it I'm interested in

[–] cynar@lemmy.world 11 points 1 year ago (1 children)

The weight of the water will push wooden pilings together. The flow of water though the gaps will also bring mud and debris into the cracks.

It's not perfect, and would need a lot of pumping/water removal, but it's just a case of manpower, at that point.

[–] MeanEYE@lemmy.world 6 points 1 year ago

In the old days they made two walls and poured dirt between them. That stopped a lot of water going in if not all.

[–] Ieatcrayons@sh.itjust.works 9 points 1 year ago

It doesn't need to be fully watertight. The rate of water passing into the dry area only needs to be lower than the rate you can pump it out.

[–] Madison420@lemmy.world 6 points 1 year ago

The oldest way to do it is to start from a bank and work your way in section by section.

It's a cofferdam if anyone is interested.

[–] Gigan@lemmy.world 1 points 1 year ago