this post was submitted on 30 Nov 2024
521 points (94.5% liked)

196

16624 readers
3507 users here now

Be sure to follow the rule before you head out.

Rule: You must post before you leave.

^other^ ^rules^

founded 2 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[–] CileTheSane@lemmy.ca 17 points 3 days ago (3 children)

The connection between 2 and 3 is blocked.

[–] Colour_me_triggered@lemm.ee 1 points 10 hours ago

Didn't notice that.

[–] hungryphrog@lemmy.blahaj.zone 4 points 3 days ago

Damn, I didn't even notice that.

[–] pingveno@lemmy.world 3 points 3 days ago

Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.