this post was submitted on 30 Mar 2024
4 points (61.1% liked)

AusFinance

993 readers
2 users here now

founded 1 year ago
MODERATORS
 

The whole floors needs to be ripped apart and fix the drain pipe then tiles needs to be done. I am looking at 10k-15k to fix everything.

you are viewing a single comment's thread
view the rest of the comments
[–] Aussiemandeus@aussie.zone 2 points 7 months ago

I think it depends if you have land lord insurance or not.

Beyond that im listening to a video about the movie tennant so i was somewhat confused