United Kingdom
General community for news/discussion in the UK.
Less serious posts should go in !casualuk@feddit.uk or !andfinally@feddit.uk
More serious politics should go in !uk_politics@feddit.uk.
Try not to spam the same link to multiple feddit.uk communities.
Pick the most appropriate, and put it there.
Posts should be related to UK-centric news, and should be either a link to a reputable source, or a text post on this community.
Opinion pieces are also allowed, provided they are not misleading/misrepresented/drivel, and have proper sources.
If you think "reputable news source" needs some definition, by all means start a meta thread.
Posts should be manually submitted, not by bot. Link titles should not be editorialised.
Disappointing comments will generally be left to fester in ratio, outright horrible comments will be removed.
Message the mods if you feel something really should be removed, or if a user seems to have a pattern of awful comments.
view the rest of the comments
What a waste. Although considering the amount of corner cutting on the building’s appearance and features, I’m not sure I’d trust the structural integrity either.
The apartments are occupied too so demolishing them is could leave people homeless.
I would hope lessons will be learned from this, plenty more rogue developments could slip through if we are ever going to ramp up house building to the needed levels without proper oversight.
While it is a waste, it is necessary not to let things like that slip. They built something they did not have a permission for, as simple as that. Just like when you decide to expand your home with an annex without a permit.
They got permission to build a house based on plans A, and actually built a house based on plans B. And by the looks of it, we are not talking about the building being 5cm to wide in one direction (which had led to a tear down order here in one case), but quite a number of massive violations.
Absolutely. I'm fully on board with them demolishing it, but they should also be liable for all costs involved with the tennants along with compensation for the additional time and effort required in the tennants part. The developers need to be held accountable for every aspect of this, not just their own costs in the demo/rebuild.