this post was submitted on 12 Sep 2023
822 points (98.0% liked)

Technology

59345 readers
5561 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

Oxford study proves heat pumps triumph over fossil fuels in the cold::Published Monday in the scientific journal Joule, the research found that heat pumps are two to three times more efficient than their oil and gas counterparts, specifically in temperatures ranging from 10 C to -20 C.

you are viewing a single comment's thread
view the rest of the comments
[–] CountVon@sh.itjust.works 4 points 1 year ago* (last edited 1 year ago) (1 children)

Was there any specifig brand/seer rating restriction with the GHGrant?

It's more complicated than that. The major components of the system all have to be qualified for the rebate, down to the component model numbers. There's a lookup tool to see which model numbers qualify. For a hybrid setup like mine, there are three parts:

  • Outside model number: this is the actual heat pump component that gets installed outside
  • Inside model number: this is the condenser coil that gets installed on top of the furnace
  • Furnace model number: this is the model number of the furnace itself

A ductless system would only have two part numbers involved, the outside heat pump unit and the inside wall unit (though a ductless install can have multiple inside units in multiple rooms). No furnace for a ductless system of course. Edit to add: and all of the major components you get have to be certified with each other by the GH program. They don't want you mixing and matching.

Every HVAC company I talked to was pretty knowledgeable about the GH program, so if you tell them you're an applicant then they should put together a quote that qualifies. Multiple HVAC reps advised me to make sure that all rebate-covered part numbers were listed clearly on the invoice. Apparently if that info is missing it can derail the rebate until the invoice is updated with full info.

[–] ikidd@lemmy.world 1 points 1 year ago (1 children)

That's a useful tool, thanks for linking that. How much did your hybrid system end up costing?

[–] CountVon@sh.itjust.works 2 points 1 year ago (1 children)

The total install was $12k. I also did another 1k in retrofits under the Greener Homes program, but I did the Greener Homes loan as well. I had to outlay the $13k up front, but then I got all of that back in a 10-year, 0% interest loan, plus $5600 in rebates on top ($5k for the heat pump, $600 for the furnace). The loan processing company debits my account $110 a month, which is low enough that it doesn't really sting.

I debated doing solar as well, since the Greener Homes loan goes up to $40k. Solar would gave easily soaked up the remaining $25k available in the loan. My roof isn't ideal for solar though, and I didn't want to triple the loan's monthly payments for a solar install that wouldn't have paid for itself over time.

[–] ikidd@lemmy.world 1 points 1 year ago

TY. I'm considering solar as I picked up 2 pallets of panels for our farm, and I don't need all of them there. I assume there's all sort of permit issues in the city for that though, so I might just skip it.