this post was submitted on 18 Jun 2024
38 points (100.0% liked)

Australia

3620 readers
96 users here now

A place to discuss Australia and important Australian issues.

Before you post:

If you're posting anything related to:

If you're posting Australian News (not opinion or discussion pieces) post it to Australian News

Rules

This community is run under the rules of aussie.zone. In addition to those rules:

Banner Photo

Congratulations to @Tau@aussie.zone who had the most upvoted submission to our banner photo competition

Recommended and Related Communities

Be sure to check out and subscribe to our related communities on aussie.zone:

Plus other communities for sport and major cities.

https://aussie.zone/communities

Moderation

Since Kbin doesn't show Lemmy Moderators, I'll list them here. Also note that Kbin does not distinguish moderator comments.

Additionally, we have our instance admins: @lodion@aussie.zone and @Nath@aussie.zone

founded 1 year ago
MODERATORS
 

"Peter Dutton has called a press conference for 10am, so it is all official – nuclear is go.

The Coalition teleconference meeting has wrapped up, and the seven sites have been named and it is as we thought: Collie in Western Australia, Mt Piper and Liddell in New South Wales, Callide and Tarong in Queensland, Northern Energy in South Australia and Loy Yang in Victoria."

"There are already issues being identified with the sites – first, the sites would need to be purchased from private operators. There will need to be some pretty major changes to legislation, both state and federally. The Queensland LNP, as recently as yesterday, said it would not lift the nuclear ban for the state, which is a problem given two Queensland reactor sites have been identified by Dutton’s team.

Tarong in Queensland is a particular issue as it doesn’t have a secure water source. In 2006, then-premier Peter Beattie had to propose a waste water pipeline as a last ditch measure to save the plant during a drought."

you are viewing a single comment's thread
view the rest of the comments
[–] Mountaineer@aussie.zone 2 points 5 months ago* (last edited 5 months ago)

So 450 x 1.8 = $810B

(I’m assuming I haven’t made a mistake about the 14 hours of storage and the converting between GW and GWh).

You have, that $1.8B would get 14GWh, not 1.
So 450 / 14 = 32.2
32.2 * 1.8 = $57.96B

These are all back of the envelope numbers of course, but 58 is ~ 14 times less than 810.

Would their seven proposed nuclear stations be cheaper than $810 Billion?

https://www.abc.net.au/news/2024-05-22/nuclear-power-double-the-cost-of-renewables/103868728

CSIRO has cranked these numbers out in a whole bunch of configurations.

In short: Australia's leading scientific organisation found it would cost at least $8.5 billion to build a large-scale nuclear power plant in the country.

8.5 * 7 = $59.5B

So it's within the ballpark to build 7 nuclear powerplants, compared to 33 (more likely less but bigger) off river pumped hydro locations.

Which don't cost as much to run, have no "scary" nuclear and can be operable much sooner, integrating with the existing infrastructure (instead of replacing it, as Nuclear effectively would have to).

If we build even one Nuclear power plant, we're going to see continuing solar and wind curtailment, exactly like they do with coal right now - which will effectively set an expensive floor on power prices.

Nuclear isn't happening if we follow the science, the money and the NIMBY sentiment.

Edit to add:
The BIGGEST difference in my mind is where the money will come from.
No financial institution will touch Nuclear, it would have to be tax dollars.
Whilst private companies are always angling for government subsidy, they are also clamouring to invest in this themselves.

A quick google search gives me a private example that is projected to come online this year: https://genexpower.com.au/250mw-kidston-pumped-storage-hydro-project/

It's only 2GWh, but it's going to start contributing to the end of coal by the end of this year, which ignoring the environmental benefit, is going to reduce wholesale power prices.

Waiting for Nuclear will make power prices worse, as the interim calls for continuing to run the coal and gas, which isn't going to make it 15 years, so new coal (or more likely a buttload more gas) will have to be built.
Which is going to RAISE prices, as it's no longer just running costs on paid off installations, it's repaying loans on new constructions.