this post was submitted on 07 Aug 2023
89 points (97.8% liked)
Europe
8484 readers
3 users here now
News/Interesting Stories/Beautiful Pictures from Europe ๐ช๐บ
(Current banner: Thunder mountain, Germany, ๐ฉ๐ช ) Feel free to post submissions for banner pictures
Rules
(This list is obviously incomplete, but it will get expanded when necessary)
- Be nice to each other (e.g. No direct insults against each other);
- No racism, antisemitism, dehumanisation of minorities or glorification of National Socialism allowed;
- No posts linking to mis-information funded by foreign states or billionaires.
Also check out !yurop@lemm.ee
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis Interconnectors make the "long term no wind in winter" scenario much less likely, though obviously this varies depending on the country; there's less opportunity for it in Australia, but on the other hand it's just much bigger - "long range" may be within the country.
As I understand it the Australian study was based on real world data.
But let's say you're right. After all the study accepted that 2% of the time it's not sufficient. You have a few options for that last 2%. One is more nuclear - not necessarily 100% nuclear, or even 40% nuclear, but enough to prevent any freak weather events from causing serious harm. Another is hydrogen - an immature technology that is nonetheless 50+ years old.
There was a European study ... I think I lost it on X though. That specifically made the case for hours not days. But to achieve that you have to over-build.
Really one of the biggest arguments for nuclear is that over-building renewables makes a minor problem with rare earths into something much more serious.
Most likely we need either some nuclear or some long-term storage. Long term storage means immature but clearly technically feasible technologies: hydrogen or iron-air, maybe a few other candidates. Against that you have the fact that with the exception of France in the 1980s, building large amounts of nuclear power quickly has almost never happened.
Nuclear just takes too long. So use it for what it is - a modest amount of baseload power at roughly twice the cost of renewables.
Let me see if I can find some of the sources ... I already posted the study on Australia.
Here's a Scottish one, they concluded that over-building renewables is feasible. Also arguing for some more hydro. Unfortunately hydro is generally considerably dirtier than nuclear.
https://scottishscientist.wordpress.com/2015/04/03/scientific-computer-modelling-of-wind-pumped-storage-hydro/
http://re100.scienceontheweb.net/
https://scottishscientist.wordpress.com/2017/07/14/wind-storage-and-back-up-system-designer/
Here's the National Grid's view; IIRC they are skeptical about the claim of 24GW of nuclear by 2050, but their models say it won't be enough on its own anyway and bet on hydrogen.
https://www.nationalgrideso.com/document/263951/download
Here are some of the numerous academic-ish sources, probably out of date. As I said, system models often assume there is infinite lithium, so doubtful IMHO.
https://web.stanford.edu/group/efmh/jacobson/Articles/I/145Country/22-145Countries.pdf
https://twitter.com/AukeHoekstra/status/1557466581185224704
https://www.helsinkitimes.fi/themes/themes/science-and-technology/22012-researchers-agree-the-world-can-reach-a-100-renewable-energy-system-by-or-before-2050.html#.YvPUxCrrWdI.twitter
https://ieeexplore.ieee.org/document/9837910
@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis
Ah, but historically, France is not an outlier. Here are the largest 10-year deployments of clean energy sources. The green ones are nuclear.
Nuclear doesn't take long.
Here is an overview of historic build times.
The task is not fearing we might get a bad case, but creating an environment in which we get a good one.
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis That graph includes some huge deployments of wind, and today, it's a mature, cheap technology (though still improving). Same with solar.
On the timescale on which the historic installs occurred, that was not the case: nuclear and hydro were the only mature options.
@Ardubal @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis Can you name *one* nuclear project in the last 20 years in Europe that wasn't severely over-budget and severely delayed?
It's not just the UK. Every third gen PWR has taken way longer than expected.
The public rightly insist on the safest designs possible. And those at least have been tried once (generally only once!). However, they take a long time.